Drinking Water
The following GN divisions people are always faced difficulties by the improper water faciity for their day to day life
- Kiran East
- Kudumpimalai
- Muruthanai
- Punanai West
- Vadamunai
- Uthuchenai
Health
| S.N | Name of the Project | GN Division | Unit of Measurement (Km/Nos etc.) | TEC (Rs.Mn) | No.Of Expected Beneficiaries |
| 01 | Supply of Ambulance to Santhively Hospital for back bone disease patients | Santhively | 1 | 12 | 900 |
| 02 | Supply of New Requirements for Health Centre | Perilavely&Vahanery | 2 | 22.11 | 650 |
| 03 | Progaramme on Multi Sectoral Approach to Nutrition Improvement | All Reset Division | 761 Families | 41.66 | 1500 |
| Total | 75.77 | 3050 | |||
Internal Roads & Culverts
| S.N | Name of the Project | GN Division | Unit of Measurement (Km/Nos etc.) | Type of Rd | TEC (Mn) | No.Of Expected Beneficiaries |
| 1 | Tharavai Rd | Perillavely | 5 | Gravel | 5.00 | 975 |
| 2 | Kulavadi junction Road to Perillavely Rd | Perillavely | 2 | Gravel | 2.00 | 950 |
| 3 | Kakkilachcholai junction to Echchaiyadi | Perillavely | 2 | Gravel | 2.00 | 900 |
| 4 | Vaddipoddamadu to Poththanai Rd | Poolakadu | 3 | Gravel | 3.00 | 600 |
| 5 | Devapuram Main Rd | Devapuram | 0.6 | Concrete | 6.00 | 1000 |
| 6 | Reset area internel Rd | Murakkodanchenai | 1.5 | Gravel | 1.50 | 950 |
| 7 | Seman Rd | Murakkodanchenai | 0.25 | Concrete | 2.50 | 1100 |
| 8 | Church Rd | Murakkodanchenai | 0.2 | Concrete | 2.00 | 1100 |
| 9 | School 1st cross Rd | Santhively | 0.196 | Concrete | 2.00 | 1050 |
| 10 | Korakallimadu Central Rd | Korakallimadu | 0.18 | Concrete | 1.80 | 990 |
| 11 | Korakallimadu Samurdthi Rd | Korakallimadu | 0.27 | Concrete | 2.70 | 650 |
| 12 | Vishnu Kovil Rd | Kiran East | 0.2 | Concrete | 2.00 | 1300 |
| 13 | Achirama Rd | Kiran East | 0.15 | Concrete | 1.50 | 1050 |
| 14 | Siva Vidyalaya Rd, | Kiran East | 0.2 | Concrete | 2.00 | 1500 |
| 15 | Vathiyarkal to Navalampiddi Rd, | Thikiliveddai | 3 | Gravel | 3.00 | 950 |
| 16 | Kulathu Rd, | Vadamunai | 0.2 | Gravel | 0.20 | 350 |
| 17 | Vadamunai to Uthuchenai Rd, | Vadamunai | 0.4 | Gravel | 0.40 | 450 |
| 18 | RDS Building Rd, | Vadamunai | 0.45 | Gravel | 0.45 | 500 |
| 19 | Kulathumadu Krishna Kovil Rd, | Vahanery | 0.75 | Gravel | 0.75 | 440 |
| 20 | Kudamunaikal School Rd, | Vahanery | 1 | Gravel | 1.00 | 400 |
| 21 | Muruthanai Rd, | Muruthanai | 5 | Gravel | 5.00 | 600 |
| 22 | Minuminuthvely Uthuchenai Rd, | Muruthanai | 12 | Gravel | 12.00 | 660 |
| 23 | School Road, Kudumpimalai Central | Kudumpimalai | 4 | Gravel | 4.00 | 790 |
| 24 | Mylanthanai main Rd | Kudumpimalai | 3 | Gravel | 3.00 | 860 |
| 25 | Kaalikovil Rd | Kiran West | 0.2 | Concrete | 2.00 | 850 |
| 26 | Koravely Rd | Koravely | 3 | Gravel | 3.00 | 950 |
| 27 | Ginnah Rd | Palaiyadithona | 2 | Concrete | 20.00 | 650 |
| Total | 50.746 | 90.80 | 22565 |
Irrigation
| S.N | Name of the Project | GN Division | Unit of Measurement (Km/Nos etc.) | TEC (Rs.Mn) | No.Of Expected Beneficiaries |
| 01 | Construction of Santhiyar road (Concreting 6 km) | Vahanery | 6.0 Km | 130 | 400 |
| 02 | Improvements to D2 channel in Vahanery scheme (Concreting 3.5km) | 3.5 Km | 80 | 450 | |
| 03 | Improvements to Farm road (Erukilampathu Bridge) to Tharavai anicut, Santhiyar anicut, and Sembayadi anicut (3km) | 3.0 Km | 15 | 300 | |
| 04 | Improvements to Adampayadiveddawan channel (Concreting 3km) | 3.0 Km | 30 | 350 | |
| 05 | Improvements to road from Santhiyar anicut to Sembayadi anicut (3km) | 3.0 Km | 15 | 325 | |
| 06 | Improvements to Mariyasingam channel (concreting 3km) | 3.0 Km | 60 | 425 | |
| 07 | Improvements to Poolakadu road (concreting 1.5 km) | 1.5 Km | 50 | 475 | |
| 08 | Improvements to Walampuri channel in Tharavai kandam (concrete lining1.5 km) | Perilavely | 1.5 Km | 15 | 600 |
| 09 | Improvements to Pattiyadiveli channel (concrete lining 2.75 km) | 2.75 Km | 60 | 360 | |
| 10 | Improvements to Wadamunai tank | Vadamunai | 1Km | 30 | 445 |
| 11 | Reconstruction of Box Culverts (10Nos) | 10Km | 20 | 410 | |
| 12 | Construction of RIP RAP production from Chainage 0+200m to 0+600 , 0+700 to 0+750m at Meiyankal Tank | Kudumpimalai | 1Km | 25 | 550 |
| 13 | Construction of toe filter from 0+200 to 0+240m & 0+330 to 0+400m at Meiyankal Tank | 1Km | 10 | 510 | |
| 14 | Construction of foot path over the spillway (100m )at Meiyankal Tank | 1Km | 5 | 520 | |
| 15 | Construction of RB main channel from 2+500 to3+500m at Meiyankal Tank | Kudumpimalai | 1Km | 7 | 390 |
| 16 | Construction ofLB main channel from 1+500 to 2+500m including Regulating Structure at Meiyankal Tank | 1Km | 8 | 410 | |
| 17 | Construction of Branch Channel at Meiyankal Tank | 0.5 Km | 5 | 500 | |
| 18 | Construction of Trough Structure at 300m of Branch Channel (BC-1)of LB Main channel at Meiyankal Tank | 0.04Km | 5 | 505 | |
| 19 | Construction of 2 Nos of Anicuts across spilltail channel of meiyankal Tank at Kurugunamadu and Periyavedduvan | Kudumpimalai | 1Km | 60 | 900 |
| 20 | Construction of RIP RAP production from Chainage 0+540m to 1+050 at Tharavai tank | Perilavely | 1Km | 5 | 250 |
| 21 | Construction of toe filter( 100m) at Tharavai Tank | 1Km | 5 | 650 | |
| 22 | Construction of Concrete linning Main channel from 0+240 to 0+540m including Regulating Structure at Tharavai Tank | 0.3 Km | 4 | 320 | |
| 23 | Construction of Branch Channels (BC-3 & BC-5) 500m at Tharavai Tank | 0.5 Km | 6 | 460 | |
| 24 | Construction of multipurpose building at Tharavai Tank | 1Km | 5 | 480 | |
| Total | 48.59Km | 655 | 10,985.00 | ||
Education
| S.N | Name of the Project | GN Division | Unit of Measurement (Km/Nos etc.) | TEC (Rs.Mn) | No.Of Expected Beneficiaries |
| 01 | Supply of Student Furniture to 21 identified schools | All Reset Area in DS Division | 3.66 | 2 | 5,000.00 |
| 02 | Supply of Teachers' Furniture to 24 identified schools | 3.14 | 2 | 5,500.00 | |
| 03 | Construction of Libraries at 8 identified schools | 1.89 | 1 | 3,200.00 | |
| 04 | Construction of Laboratories at 2 identified schools | 0.57 | 0.3 | 2,800.00 | |
| 05 | Supply of Office Furniture to 11 identified schools | 0.79 | 0.4 | 4,500.00 | |
| 06 | Supply of Computers & Photocopiers to 24 identified schools | 3.00 | 2 | 5,500.00 | |
| 07 | Construction of Class Room Buildings to identified 13 schools | 57.00 | 30 | 4,300.00 | |
| 08 | Construction of Admin Building at 18 identified schools | 6.30 | 3 | 4,900.00 | |
| 09 | Construction of Science Labs at 2 identified schools | 0.60 | 0.3 | 3,000.00 | |
| 10 | Construction of Activity Rooms at 26 identified schools | 6.00 | 3 | 5,900.00 | |
| 11 | Construction of Libraries at 6 identified schools | 1.80 | 1 | 4,300.00 | |
| 12 | Construction of Parapet wall at 22 identified schools | 13.30 | 8 | 4,900.00 | |
| 13 | Construction of Children Play Ground at 26 identified schools | 14.40 | 8 | 5,900.00 | |
| 14 | Construction of Toilets at 26 identified schools | 9.90 | 5 | 5,900.00 | |
| 15 | Provision of Water supply to 15 identified schools | 7.30 | 4 | 4,800.00 | |
| Total | 129.65 | 70 | 70,400 | ||