| S.N |
Name of the Project |
GN Division |
Unit of Measurement (Km/Nos etc.) |
TEC (Rs.Mn) |
No.Of Expected Beneficiaries |
| 01 |
Construction of Santhiyar road (Concreting 6 km) |
Vahanery |
6.0 Km |
130 |
400 |
| 02 |
Improvements to D2 channel in Vahanery scheme (Concreting 3.5km) |
3.5 Km |
80 |
450 |
| 03 |
Improvements to Farm road (Erukilampathu Bridge) to Tharavai anicut, Santhiyar anicut, and Sembayadi anicut (3km) |
3.0 Km |
15 |
300 |
| 04 |
Improvements to Adampayadiveddawan channel (Concreting 3km) |
3.0 Km |
30 |
350 |
| 05 |
Improvements to road from Santhiyar anicut to Sembayadi anicut (3km) |
3.0 Km |
15 |
325 |
| 06 |
Improvements to Mariyasingam channel (concreting 3km) |
3.0 Km |
60 |
425 |
| 07 |
Improvements to Poolakadu road (concreting 1.5 km) |
1.5 Km |
50 |
475 |
| 08 |
Improvements to Walampuri channel in Tharavai kandam (concrete lining1.5 km) |
Perilavely |
1.5 Km |
15 |
600 |
| 09 |
Improvements to Pattiyadiveli channel (concrete lining 2.75 km) |
2.75 Km |
60 |
360 |
| 10 |
Improvements to Wadamunai tank |
Vadamunai |
1Km |
30 |
445 |
| 11 |
Reconstruction of Box Culverts (10Nos) |
10Km |
20 |
410 |
| 12 |
Construction of RIP RAP production from Chainage 0+200m to 0+600 , 0+700 to 0+750m at Meiyankal Tank |
Kudumpimalai |
1Km |
25 |
550 |
| 13 |
Construction of toe filter from 0+200 to 0+240m & 0+330 to 0+400m at Meiyankal Tank |
1Km |
10 |
510 |
| 14 |
Construction of foot path over the spillway (100m )at Meiyankal Tank |
1Km |
5 |
520 |
| 15 |
Construction of RB main channel from 2+500 to3+500m at Meiyankal Tank |
Kudumpimalai |
1Km |
7 |
390 |
| 16 |
Construction ofLB main channel from 1+500 to 2+500m including Regulating Structure at Meiyankal Tank |
1Km |
8 |
410 |
| 17 |
Construction of Branch Channel at Meiyankal Tank |
0.5 Km |
5 |
500 |
| 18 |
Construction of Trough Structure at 300m of Branch Channel (BC-1)of LB Main channel at Meiyankal Tank |
0.04Km |
5 |
505 |
| 19 |
Construction of 2 Nos of Anicuts across spilltail channel of meiyankal Tank at Kurugunamadu and Periyavedduvan |
Kudumpimalai |
1Km |
60 |
900 |
| 20 |
Construction of RIP RAP production from Chainage 0+540m to 1+050 at Tharavai tank |
Perilavely |
1Km |
5 |
250 |
| 21 |
Construction of toe filter( 100m) at Tharavai Tank |
1Km |
5 |
650 |
| 22 |
Construction of Concrete linning Main channel from 0+240 to 0+540m including Regulating Structure at Tharavai Tank |
0.3 Km |
4 |
320 |
| 23 |
Construction of Branch Channels (BC-3 & BC-5) 500m at Tharavai Tank |
0.5 Km |
6 |
460 |
| 24 |
Construction of multipurpose building at Tharavai Tank |
1Km |
5 |
480 |
|
Total |
48.59Km |
655 |
10,985.00 |